Skip to main content

Online Store

D-940 Work Change Directive—Design-Build Project

D-940 Work Change Directive—Design-Build Project

Available
Price:

$69.00 - D-940 Work Change Directive—Design-Build Project

$35.00 - D-940 Work Change Directive—Design-Build Project

Year published:2016
69.00Add to Cart
Description
EJCDC D-940 is an all-new document for the Owner and Design-Builder’s use in authorizing changes in the Owner/Design-Builder contract before the parties have reached agreement on the effect on price, time, or both. This document is similar EJCDC C-940 (for design-bid-build) but is specific to design-build project delivery. Using EJCDC D-940 in design-build brings improved clarity to administering changes to a design-build contract
Rating: 0 out of 5
  • 1
  • 2
  • 3
  • 4
  • 5
No Reviews
Share it:

Reviews

No records found.

    © NSPE. All Rights Reserved.