Skip to main content

Online Store

D-941 Change Order—Design-Build Project

D-941 Change Order—Design-Build Project

Available
Price:

$60.00 - D-941 Change Order—Design-Build Project

$30.00 - D-941 Change Order—Design-Build Project

Year published:2016
60.00Add to Cart
Description
EJCDC D-941 is an all-new document for the Owner and Design-Builder’s use in authorizing changes in the Owner/Design-Builder contract, including changes to price, time, or other provisions of the contract. This document is similar EJCDC C-941 (for design-bid-build) but is specific to design-build project delivery. Using EJCDC D-941 in design-build brings improved clarity to administering changes to a design-build contract.
Rating: 0 out of 5
  • 1
  • 2
  • 3
  • 4
  • 5
No Reviews
Share it:

Reviews

No records found.

    © NSPE. All Rights Reserved.